PRODUCTS / 05

LV Capacitor Banks

Fixed or automatic power-factor correction solutions selected after load and harmonic assessment.

SB / JEDDAH

Final configuration, ratings, components and integration scope are confirmed only after review and approval of project documents.

05
VISUAL OVERVIEW

From complete assembly to engineered detail

Representative visuals illustrate the design and assembly direction. The final product is governed exclusively by the project scope, drawings and approvals.

01Project-defined design
02Disciplined assembly
03Documented inspection & testing
WHAT IT IS

Power-factor correction

The assembly is engineered around the actual project scope, including ratings, protection, operating method, monitoring and integration. Control or integration functions are not assumed unless they are included in the approved technical scope.

PROBLEMS IT SOLVES
  • ✓Low power factor
  • ✓Reactive-power demand
  • ✓Project-defined correction steps
MAIN APPLICATIONS
  • ✓Automatic correction
  • ✓Fixed correction
  • ✓Industrial and commercial loads
TYPICAL SECTORS
FactoriesCommercial buildingsWater facilitiesLarge electrical loads
FOR A TECHNICAL & COMMERCIAL OFFER

Information required before quotation

Complete inputs help define scope, exclusions and required approvals more accurately.

  1. 01Measured load profile
  2. 02Current power factor
  3. 03Harmonic assessment
  4. 04Target correction and system voltage
NEXT STEP

Need a technical offer for LV Capacitor Banks?

Request a quotation↗Arrange a technical meeting